In 2021, our company supplied equipment for Outdoor SWG-110 kV produced by GE and TRENCH for the contractor Mirenergocom LLC, which signed a contract for the performance of work with Kharkivoblenergo OJSC.
Technical re-equipment of Substation 110/35/10/6 kV "SiM" with the replacement of the T-2 power transformer of the TDTNG-40500/110/ZTZ type with a power transformer of the TDTN-40000/110-U1 type.
As part of the technical re-equipment of the Substation "Serp and Molot", it was planned to dismantle and install equipment for Outdoor SWG-110 kV, SWG-35 kV, Indoor SWG-10 kV and SWG-6 kV.
SF6 Live Tank Circuit Breaker 145 kV GL312 F1/4031 P - 1 pcs
Current transformer 126 kV IOSK 123 with paper-oil insulation - 3 pcs